Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Wärtsilä to develop regasification system for India’s LNG terminal

    Wärtsilä to develop regasification system for India’s LNG terminal

    July 5, 2021
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Illustration of LNG terminal

    Oslo, Norway — The technology group Wärtsilä will develop the regasification system for a new offshore LNG terminal to be built in the Bay of Bengal. The project is headed by Crown LNG, a Norwegian group specialising in developing LNG infrastructure for harsh weather conditions, with Oslo-based engineering company Aker Solutions as the main contractor.

    Wärtsilä Gas Solutions will conduct the front-end engineering and design (FEED) of the regasification system. The early phase of the FEED contract was booked in May 2021. Final Investment Decision for the project expected in 2022 with further equipment delivery of the regasification systems.

    The terminal will sit on the seabed approximately 19 kilometres north-east of Kakinada on India’s east coast, approximately 11 km from the shoreline. It will be exposed to challenging monsoon weather conditions, and Wärtsilä’s extensive experience in delivering regasification systems for more than 20 similar floating storage and regasification units (FSRU) around the world was cited as a major consideration in the award of the contract.

    The Wärtsilä system will serve the terminal with an annual regasification capacity of 7.2 million metric tonnes, and will include the boil-off gas (BOG) handling and fuel gas systems.

    “This will be a challenging project, and the companies selected to engineer and design the systems required must be well qualified. Wärtsilä has an excellent track record in delivering regasification systems, and we are confident that they are a good match this assignment,” said Sturla Magnus, EVP Topsides & Facilities in Aker Solutions.

    “We are honoured to have been chosen to design and deliver the regasification system for this LNG terminal project. Our regas systems are delivered as complete modules, with all the engineering, component procurement, and construction of the module carried out entirely by the company’s execution team. This makes integrating the modules very easy, and we look forward to smooth inter-connection work with the other project partners,” commented Reidar Strande, General Manager, Strategy & Business Development, Wärtsilä Gas Solutions.

    It is estimated that the LNG terminal will be completed and fully operational approximately three years after the final investment decision has been made.

    Wärtsilä Gas Solutions is a market leader with innovative systems and lifecycle solutions for the gas value chain. Our main focus areas are the handling of gas in seaborne transport (storage, fuel, transfer and BOG management), gas to power, liquefaction and biogas solutions. We help our customers on the journey towards a sustainable future through a focus on lifecycle, innovation and digitalisation.

    Related News

    How Shell’s $2bn HI project unlocks a 40-year-old discovery

    FG backs Brass methanol, gas projects to drive industrial growth, job creation

    Nigeria unlocks $8bn in gas investments as Tinubu’s energy reforms take root

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    Nigeria, Denmark strengthen partnership to boost maritime development

    November 7, 2025

    AFMESI, DOTCAN partner to build capacity in Blue Economy

    November 7, 2025

    West Africa’s major energy stakeholders to lead on clean energy conversation

    November 7, 2025

    Afreximbank extends $36.4m contract financing facility to Egypt’s SAMCO

    November 7, 2025

    How Shell’s $2bn HI project unlocks a 40-year-old discovery

    November 7, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.