Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Nigeria’s power generation reaches record 4,477mw

    Nigeria’s power generation reaches record 4,477mw

    August 15, 2012
    Share
    Facebook Twitter LinkedIn WhatsApp

    15 August 2012, Sweetcrude, ABUJA – POWER generation in Nigeria has reached a record 4,477.7 megawatts, mw, with 170mw being kept in the reserve.

    News of the highest ever power generated in Nigeria was broken Tuesday by Mr. Ogbuagu Anikwe, a spokesman of the Power Minister, Prof Barth Nnaji.

    The new generation level is 240.7mw higher than the peak 4,237mw achieved on August 6.

    A statement by Anikwe quoting Nnaji, said the good news in the latest development is that “every power generated is wheeled comfortably” as against the situation in August, 2010 when the country generated 3,800mw for the first, but “the system collapsed within a few minutes because the transmission infrastructure was poorly maintained.”

    Former PHCN executive director and former chief executive officer of the Egbin Power Station in Lagos, Mr Simeon Atakulu, said of the latest development: “It is significant that the new record in generation has been set even with the 1,320mw Egbin plant, the nation’s biggest power generator, doing only 600mw because it is undergoing routine maintenance.

    “This means we have a spare power capacity of over 300mw.”
    The new output increase is from the 600mw-capacity Shiroro Hydro Station in Niger State, which was falsely reported by a section of the media at the weekend to have been shut by junior electricity workers, allegedly protesting unresolved issues over the privatisation of the Power Holding Company of Nigeria, PHCN.

    Related News

    ‘Nigeria’s $5bn oil-backed loan from Aramco delayed by oil price drop’

    Shipping firms dodge $900m cost, as Nigeria hit by empty container glut

    India’s $80 billion coal-power boom is running short of water

    E-book
    Resilience Exhibition

    Latest News

    ‘Nigeria’s $5bn oil-backed loan from Aramco delayed by oil price drop’

    June 10, 2025

    Shipping firms dodge $900m cost, as Nigeria hit by empty container glut

    June 10, 2025

    Seplat to establish office in Akwa Ibom, gets govt approval

    June 10, 2025

    Afreximbank reaffirms financial resilience and transparency

    June 10, 2025

    India’s $80 billion coal-power boom is running short of water

    June 10, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.