Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Shell to start gas production at expanded Nigeria project

    Shell to start gas production at expanded Nigeria project

    August 23, 2017
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Shell .

    Oscarline Onwuemenyi, with agency reports
    23 August 2017, Sweetcrude, Abuja – Anglo-Dutch oil major Royal Dutch Shell has started gas production from the second phase of the Gbaran-Ubie project in Nigeria’s Niger Delta, the company said on Wednesday.

    The project is an expansion of the Gbaran-Ubie development, which opened in June 2010.

    Shell, through its Shell Petroleum Development Company of Nigeria subsidiary, said the project would reach peak production of around 175,000 barrels of oil equivalent per day in 2019.

    Shell Petroleum Development Company of Nigeria is the operator of a Nigerian joint venture between state-owned Nigerian National Petroleum Corporation, Total E&P Nigeria and ENI subsidiary Nigerian Agip Oil Company.

    In 2013, Shell announced an investment of $3.9billion (about N612.3 billion) in two major gas projects in Nigeria.

    Shell Petroleum Development Company of Nigeria Ltd (SPDC), an operator of a joint venture with the Nigerian National Petroleum Corporation (NNPC), said final investment decisions have been reached for the Trans Niger Pipeline loop-line (TNPL) and the Gbaran-Ubie Phase 2 projects, both located in Nigeria’s eastern Niger Delta.

    The total capital investment for the TNPL project bundle is expected to be $1.5 billion, while total investment for the Gbaran-Ubie Phase Two bundle is $2.4 billion. The expected peak production from these projects is 215,000 barrels of oil per day equivalent.

    The Gbaran-Ubie Phase Two project consists of five gas supply and infrastructure projects, which are critical for the continued gas supply to the Nigeria Liquefied Natural Gas (NLNG) plant and the Gbaran-Ubie domestic power plant (IPP).

    Related News

    Israel to resume natural gas exports when military deems it’s safe, energy minister says

    Africa’s nuclear renaissance: World Bank greenlight ignites a new era

    Transocean Coatings establishes affiliate at SIIFZ

    E-book
    Resilience Exhibition

    Latest News

    Mozambique energy minister optimistic on TotalEnergies’ plan to resume LNG project

    June 20, 2025

    Nigerian Navy cracks down on oil theft, arrests 76 vessels in two years

    June 20, 2025

    Shell, Chevron pledge fresh multi-billion-dollar investments in Nigeria’s oil sector

    June 20, 2025

    200 beneficiaries receive NDDC foreign post graduate scholarship

    June 20, 2025

    Nigeria, Equatorial Guinea advance GoG gas pipeline project with new roadmap

    June 20, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.