Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » ‘Trucks turnaround time down 70 percent at Lagos ports’

    ‘Trucks turnaround time down 70 percent at Lagos ports’

    October 20, 2021
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Trucks on the Apapa/Mile-2/Oshodi expressway

    Vincent Toritseju

    Lagos — The introduction of the electronic call-up system has drastically reduced truck turnaround time at the Lagos ports by 70 percent and the cost of transporting containerised cargoes within the Lagos metropolis by 60 percent.

    This is according to the management of Transit Truck Park, TTP, operating the call up system.

    Operating Officer of TTP, Mr. Dayo Adeboye, while speaking to newsmen in Lagos, said that though hitches were being experienced at the Mile-2 end of the Apapa-Oshodi expressway due to ongoing construction work there, the system had registered considerable success so far.

    and yet to be coordinated call up system for tankers.

    Adeboye also said that before the intervention of TTP in the management of the movement of vehicles in and out of the Lagos ports, the average turnaround time for Reefer Trucks was two weeks but that it has been reduced to 60 hour which is 2 and half days.

    For flatbed and empty containers, the average turnaround time was also two weeks but now reduced to 62 and 90 hours while export containers now have a turnaround time of 76 hours as against two weeks previously.

    For the cost of moving a 40 feet container from Apapa port to any warehouse or location within Lagos metropolis, it used to cost about a N1million, but this has this has reduced to N400,000, representing a 60 percent decrease.

    Adeboye explained that on a daily basis, about 4,000 trucks were on the port access roads and adjoining streets within and around the Apapa area, saying most of these have been moved into truck parks scattered around Lagos.

    Follow us on twitter

    Related News

    Oando secures $375m Afreximbank loan to boost oil and gas expansion plan

    Nigeria loses N710bn to gas flaring in four months

    Nigeria’s renewable power capacity to reach 1.7GW in 2035

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    ‘OPEC oil output rises in May but compensation cuts limit hike’

    June 9, 2025

    Chevron CEO warned staff of rising safety issues before fatal Angola platform fire

    June 9, 2025

    Oil prices steady ahead of US-China trade talks

    June 9, 2025

    Kwairanga reiterates NGX’s commitment to deepening Nigeria’s capital market

    June 9, 2025

    Shettima inaugurates power project in Borno university

    June 9, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.