Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » India to account for 21% of APAC LNG regasification capacity by 2025

    India to account for 21% of APAC LNG regasification capacity by 2025

    November 3, 2021
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Process flow of a typical LNG receiving and regasification plant.

    Lagos — India is expected to register the second highest LNG regasification capacity additions in Asia between 2021 and 2025, contributing about 21% of the region’s total capacity additions by 2025, says GlobalData, a leading data and analytics company.

    GlobalData’s report, ‘Global LNG Industry Outlook to 2025 – Capacity and Capital Expenditure Outlook with Details of All Operating and Planned Terminals’, reveals that India is likely to witness a total LNG regasification capacity additions of 3,428 billion cubic feet (bcf) by 2025. Of this, 3,062 bcf of capacity would be from the new-build terminals while the rest of the capacity is from the expansion of the existing regasification terminals.

    Teja Pappoppula, Oil and Gas Analyst at GlobalData, comments: “Most of the capacity additions in India are through the new build projects with the announced Kakinada GBS Floating terminal being the largest with a capacity of 351 bcf. The Crown LNG India-operated terminal is expected to become operational in 2024.”

    Among the expansion projects, the Hazira Expansion regasification terminal accounts for most of the expansion capacity additions in India with 244 bcf of capacity expected to be added by 2025.

    The third highest contributor in the country is the planned Jaigarh Port Floating terminal which is likely to add a capacity of 274 bcf in 2021. H-Energy Gateway Pvt Ltd will be the operator of this regasification terminal.

    Related News

    ADNOC Gas takes FID and awards $5b contracts for RGD project

    ‘Shell’s decision on Phase 2 of LNG Canada will depend on other opportunities’

    Nigeria loses N710bn to gas flaring in four months

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    South Africa’s April manufacturing output falls 6.3% y/y

    June 11, 2025

    UK reaffirms support for Nigeria’s energy transition efforts

    June 11, 2025

    Oando appoints Ayotola Jagun as Executive Director

    June 11, 2025

    AI to bolster oil recovery as Africa maximizes production at ageing fields

    June 11, 2025

    ADNOC Gas takes FID and awards $5b contracts for RGD project

    June 11, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.