Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » TotalEnergies launches FEED for Papua LNG project

    TotalEnergies launches FEED for Papua LNG project

    March 7, 2023
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Papua New Guinea flag

    Paris – TotalEnergies, operator of the project, has announced the launch of the fully integrated Front-End Engineering and Design (FEED) for the Papua LNG project.

    Following pre-FEED studies, in order to maximize synergies and minimize the costs, Papua LNG partners have selected a concept including four electrical LNG trains (e-trains) with a total capacity of 4 Mt/y. These trains will be built within the existing liquefaction plant of PNG LNG in Caution Bay. Papua LNG has also secured the use of 2 Mt/y of additional liquefaction capacity in the existing trains of PNG LNG. By selecting e-trains and re-injecting the native CO2 produced into the reservoirs, Papua LNG demonstrates its commitment to the reduction of the carbon intensity of the project. The construction and operation of the electrical liquefaction trains will be delegated to ExxonMobil, operator of the PNG LNG project since 2014.

    In the framework of this integration between Papua LNG and PNG LNG, TotalEnergies is pleased to also announce the signature of a head of agreement with JX Nippon in the view to sell a 2% interest (post Kumul back-in right) in Papua LNG. JX Nippon is an affiliate of ENEOS and already holds a 4.7% interest in PNG LNG.

    TotalEnergies holds 40.1% interest in Papua LNG, along with its joint venture partners ExxonMobil (37.1%) and Santos (22.8%). The State of Papua New Guinea may exercise a back-in right of up to 22.5% interest at the Final Investment Decision planned by end 2023-early 2024. Production start-up is scheduled four years later.

    “The integrated FEED entry is a significant step in the development of the Papua LNG project. TotalEnergies and its partners are working closely with the Government, the communities, and the local economic network to ensure the Papua LNG Project serves as a landmark on the societal and environmental front for the LNG industry”, said Julien Pouget, Senior Vice President Asia Pacific for Exploration & Production and Renewables at TotalEnergies. “This project, strongly supported by the Papua New Guinea State, will contribute to the security of LNG supply, especially for customers in Asia, where LNG can substitute coal for power generation and participate in a substantial reduction of CO2 emissions in the region.”

    “The Papua LNG Project is a project of national significance for Papua New Guinea and will stimulate business confidence and provide a significant impetus for our economy” said the Honorable Kerenga Kua, Minister of Petroleum and Energy of Papua New Guinea. The Marape-Rosso government places high priority on the delivery of Papua LNG project, we have an improved deal for our people, and improved contribution of our national contractors and work force. The government strongly supports the Papua LNG project and encourages all stakeholders including project partners to work diligently to deliver an “on time-on budget” project.”

    Papua LNG to set one of the highest standards in the industry
    During the study phase and the construction of the project, TotalEnergies and its partners are working closely with an independent panel of experts, highly recognized for their contribution on environment and socio-economic development, to make this project best-in-class in terms of sustainability. These experts are supporting the development of the project and formulate recommendations that can be found on the Papua LNG website (www.papualng.com.pg). The Papua LNG project is committed to building long-term constructive relationships with its stakeholders and providing benefits for the country.

    Follow us on twitter

    Related News

    ADNOC Gas takes FID and awards $5b contracts for RGD project

    Nigeria loses N710bn to gas flaring in four months

    NLNG, NCDMB launch training for 140 Nigerians as Train-7 hits 80% completion

    E-book
    Resilience Exhibition

    Latest News

    ADNOC Gas takes FID and awards $5b contracts for RGD project

    June 10, 2025

    ‘Nigeria’s $5bn oil-backed loan from Aramco delayed by oil price drop’

    June 10, 2025

    Shipping firms dodge $900m cost, as Nigeria hit by empty container glut

    June 10, 2025

    Seplat to establish office in Akwa Ibom, gets govt approval

    June 10, 2025

    Afreximbank reaffirms financial resilience and transparency

    June 10, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.