Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Eni celebrates sail away of FPSO to oil field offshore Africa

    Eni celebrates sail away of FPSO to oil field offshore Africa

    April 10, 2023
    Share
    Facebook Twitter LinkedIn WhatsApp
    *FPSO Firenze

    London – Eni, in partnership with PetroCi, celebrated the sail away of the FPSO Firenze to the Baleine field offshore Côte d’Ivoire in Dubai. The event was attended by Mamadou Sangafowa-Coulibaly, Minister of Mines, Petroleum and Energy Côte of d’Ivoire, and other dignitaries.

    The FPSO Firenze will allow production start-up of the Baleine field, which is the largest hydrocarbon discovery in Côte d’Ivoire to date, with an estimated oil in place of 2.5 Bbbl and 3.3 trillion cubic feet of associated gas. The development of Baleine will also be Africa’s first net-zero emission project (Scope 1 and 2).

    The FPSO Firenze, that will be renamed Baleine after its arrival in Cote d’Ivoire, has been refurbished and upgraded to allow it to treat up to 15,000 bpd of oil and around 25 Mcfd/d of associated gas. The entire gas production will be delivered onshore via a newly built export pipeline.

    The installation of the subsea production system and well completion campaign are underway and will ensure an accelerated start-up of production by June 2023.

    Eni’s phased development model and fast track have proven to be effective, as the project is set to start production less than 2 years from the Baleine 1X discovery well and one and a half years after the FID. Eni is already progressing swiftly on the second phase of the project forecasting a start-up of production by December 2024 after having taken the FID in December 2022.

    Eni is committed to sustainable development, and the Baleine field’s net-zero emission project is a significant step towards achieving this goal. The Baleine field extends over blocks CI-101 and CI-802. Eni also owns interests in four other blocks in the Ivorian deep water: CI-205, CI-501, CI-401, and CI-801, all with the same partner, PetroCi Holding.

    Related News

    Seplat Energy earns CIPS Procurement Excellence Standard Certificate 

    IEA says it stands ready to tap emergency oil stocks, OPEC sees no need

    US EPA proposes higher biofuel blending volumes through 2027

    E-book
    Resilience Exhibition

    Latest News

    FG reiterates commitment to port automation

    June 14, 2025

    Seplat Energy earns CIPS Procurement Excellence Standard Certificate 

    June 14, 2025

    Meta signs deal for advanced geothermal power in New Mexico

    June 14, 2025

    IEA says it stands ready to tap emergency oil stocks, OPEC sees no need

    June 14, 2025

    China solar industry to address overcapacity challenge but turnaround far off, experts say

    June 14, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.