Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Environment
    • Community Development
    • Renewable Energy
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Dutch postpone offshore wind farm tenders due to low interest

    Dutch postpone offshore wind farm tenders due to low interest

    May 17, 2025
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Offshore wind farm.

    Amsterdam — The Netherlands will postpone tenders for two offshore wind farms with a total capacity of 2 gigawatts (GW) due to a lack of interest from potential bidders, the Dutch government said on Friday.

    The tenders had originally been planned for September. The government said it would now only open a tender for one location in the North Sea with a capacity of 1 GW then.
    The Dutch Climate ministry said in March that interest for the three sites it wanted to tender was very low, after energy firms Eneco and Orsted had said they saw no viable business case without subsidies.
    The government said it was still looking into ways to reintroduce subsidies in its tenders for offshore wind farms, as prospective bidders are backing out of the current “zero subsidy” model.
    Climate minister Sophie Hermans said detailed plans for the future tenders would be presented by the third quarter, after having missed her earlier announced mid-April deadline.
    The Netherlands last year pushed back plans to increase offshore wind capacity from 4.7 GW to 21 GW to the end of 2032 instead of 2030, citing costs, supply chain difficulties and “challenges in timely decision-making”.

    Reporting by Bart Meijer; Editing by Kirsten Donovan – Reuters

    Related News

    Aso Rock dumps national grid over ₦47bn annual power bill

    Mambilla power fraud: Witness explains FEC document certification dispute

    Tinubu ramps up power access with 1,000 mini-grid projects

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    Nigeria’s gas output climbs to 7.93bcf/d as domestic demand strengthens — NUPRC

    June 16, 2026

    World Bank lists Tincan, Apapa ports on global top 20 improved ports

    June 16, 2026

    NUPRC attributes rise in Nigeria’s oil production to ‘sustained positive momentum’

    June 16, 2026

    Resurgent piracy and grey-zone pressure reshape maritime risk

    June 16, 2026

    Oil drops about 4% to three-month low as markets weigh US-Iran deal

    June 16, 2026
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2026 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.