Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » India allows extension for commissioning of certain solar power projects until December

    India allows extension for commissioning of certain solar power projects until December

    April 22, 2025
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Solar energy farm

    News wire — India’s Ministry of New & Renewable Energy (MNRE) has granted a nine-month extension for the commissioning of certain solar projects by two government agencies, pushing the deadline to the end of December 2025 due to multiple challenges, a document seen by Reuters showed.

    In a letter to the Solar Energy Corporation of India (SECI) and the Indian Renewable Energy Development Agency (IREDA), the MNRE cited limited availability of domestically made photovoltaic solar modules, transmission infrastructure issues, and tender-related delays as reasons for the extension.
    The SECI and IREDA had requested the extension for projects tendered under the federal government’s Central Public Sector Undertaking (CPSU) Scheme Phase-II.
    The scheme aims to set up 12 gigawatts of solar projects by state-run entities, using domestically manufactured solar PV cells and modules, with financial support from the Indian government.
    The extension underscores the struggles faced by India’s renewable energy sector as the country targets at least 500 GW of non-fossil power capacity by 2030, up from 172 GW currently.
    The sector is grappling with several obstacles, including weak demand for tenders, land acquisition challenges, delays in power purchase agreements and project cancellations.
    The country also fell short of its earlier goal of adding 175 GW of renewable energy capacity by 2022, with fossil fuels still accounting for more than two-thirds of total power generated last year.

    Reporting by Sethuraman NR; Editing by Shailesh Kuber – Reuters

    Related News

    Rockefeller Foundation’s Clean Energy deal to unlock $110bn investment in developing countries

    Schneider Electric’s Panel Builder Programme empower local builders

    China pushes ahead in battery technology race

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    Renaissance surpasses oil output target by 40% in first month

    May 16, 2025

    Ogbuku okays legal drive to tackle Niger Delta challenges

    May 16, 2025

    President Tinubu charts a new course for Nigeria’s tax system

    May 16, 2025

    Indorama sets gold standard for privatisation as veteran spokesman bows out

    May 16, 2025

    Nigeria unveils climate investment platform to unlock $500m in green finance

    May 16, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.