Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Environment
    • Community Development
    • Renewable Energy
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » India unveils $77 billion hydro plan as China builds upstream dam

    India unveils $77 billion hydro plan as China builds upstream dam

    October 13, 2025
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Dam

    New Delhi — India’s power planning authority has drawn up a 6.4 trillion rupees ($77 billion) transmission plan to move more than 76 gigawatts of hydroelectric capacity from the Brahmaputra basin by 2047 to meet rising electricity demand, the Central Electricity Authority (CEA) said on Monday.

    In a report released on Monday, the CEA said the plan covers 208 large hydro projects across 12 sub‑basins in the northeastern states, with 64.9 GW of potential capacity and an additional 11.1 GW from pumped‑storage plants.
    The Brahmaputra River, which rises in Tibet, China, and flows through India and Bangladesh, holds significant hydro potential in its Indian stretch, particularly in Arunachal Pradesh on the China border.
    The basin’s transboundary nature and proximity to China make water management and infrastructure planning a strategic concern, amid India’s fears that a Chinese dam on the Yarlung Zangbo, the river’s upper course before it enters India, could cut dry‑season flows on the Indian side by up to 85%.
    The Brahmaputra basin spans parts of Arunachal Pradesh, Assam, Sikkim, Mizoram, Meghalaya, Manipur, Nagaland and West Bengal, and holds more than 80% of India’s untapped hydro potential, the report said, with Arunachal Pradesh alone accounting for 52.2 GW.
    Phase one of the plan, running to 2035, will require 1.91 trillion rupees, while phase two will cost 4.52 trillion rupees, according to the CEA.
    The CEA’s plan also includes projects allocated to central public sector utilities such as NHPC , NEEPCO, and SJVN, with some projects already in the pipeline.
    India aims to reduce its dependence on fossil fuels by having 500 GW of non-fossil power generation capacity by 2030 and becoming net zero by 2070.

    Reporting by Sethuraman NR; Editing by Tasim Zahid – Reporting

    Related News

    Aso Rock dumps national grid over ₦47bn annual power bill

    Mambilla power fraud: Witness explains FEC document certification dispute

    Tinubu ramps up power access with 1,000 mini-grid projects

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    Nigeria’s gas output climbs to 7.93bcf/d as domestic demand strengthens — NUPRC

    June 16, 2026

    World Bank lists Tincan, Apapa ports on global top 20 improved ports

    June 16, 2026

    NUPRC attributes rise in Nigeria’s oil production to ‘sustained positive momentum’

    June 16, 2026

    Resurgent piracy and grey-zone pressure reshape maritime risk

    June 16, 2026

    Oil drops about 4% to three-month low as markets weigh US-Iran deal

    June 16, 2026
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2026 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.