Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Environment
    • Community Development
    • Renewable Energy
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Valmet to supply automation for hydrogen fuel cell power facility in South Korea

    Valmet to supply automation for hydrogen fuel cell power facility in South Korea

    October 28, 2025
    Share
    Facebook Twitter LinkedIn WhatsApp

    Lagos — Valmet has been selected to supply mission-critical automation solutions for a 20-megawatt (MW) hydrogen fuel cell power facility in Naepo New Town, South Korea, supporting Naepo City’s vision of becoming a clean energy hub.

    “We have previously partnered with Valmet on a biomass power plant and are now pleased to continue our collaboration on this pioneering hydrogen fuel cell project. Their automation expertise gives us confidence in achieving the clean energy goals for Naepo City,” says Changhyun Jung, Manager, Power Green Energy Department, Plant Business Division, Lotte Engineering & Construction.

    Lotte Engineering & Construction is acting as the EPC (Engineering, Procurement and Construction) contractor for the project. The end user, Naepo Green Energy Company, aims to transform Naepo City into a clean energy hub by complementing its existing 500 MW LNG combined heat and power (CHP) plant with hydrogen-based power generation.

    “Valmet is committed to supporting the global clean energy transition with advanced automation solutions. We are pleased to receive this new order from Lotte Engineering & Construction, reflecting the mutual trust built through our previous collaboration. This project further strengthens our position and opens new opportunities for energy transition applications in the region,” says Wanmo Yoon, Sales Manager, Asia-Pacific and China, Energy and Process Systems, Automation Solutions, Valmet.

    The order is included in Valmet’s orders received of the third quarter of 2025. The value of the order will not be disclosed. Delivery is scheduled for January 2026.

    Related News

    Aso Rock dumps national grid over ₦47bn annual power bill

    Mambilla power fraud: Witness explains FEC document certification dispute

    Tinubu ramps up power access with 1,000 mini-grid projects

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    Nigeria’s gas output climbs to 7.93bcf/d as domestic demand strengthens — NUPRC

    June 16, 2026

    World Bank lists Tincan, Apapa ports on global top 20 improved ports

    June 16, 2026

    NUPRC attributes rise in Nigeria’s oil production to ‘sustained positive momentum’

    June 16, 2026

    Resurgent piracy and grey-zone pressure reshape maritime risk

    June 16, 2026

    Oil drops about 4% to three-month low as markets weigh US-Iran deal

    June 16, 2026
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2026 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.