Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Environment
    • Community Development
    • Renewable Energy
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » 28 plants generate 5,577MW of electricity in July 2025

    28 plants generate 5,577MW of electricity in July 2025

    August 19, 2025
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Egbin Power plant.

    Mkpoikana Udoma

    Port Harcourt — 28 grid-connected electricity generation plants across Nigeria generated an average of 5,577 megawatts, MW, of electricity in July 2025, reflecting a marginal increase of 5% from the 5,292MW recorded in June 2025.

    Data on the operational performance of power plants released by the Nigerian Electricity Regulatory Commission, NERC, highlighted that the 28 plants achieved only a 41% availability factor despite their cumulative installed capacity of 13,625MW.

    The report showed that larger power plants, including Egbin ST, Delta GS, Kainji, Shell’s Afam VI, Zungeru, Odukpani, Shiroro, Jebba, Okpai, Azura IPP, and Geregu, contributed 4281 MW on average, accounting for 76.7% of the total energy generated in December.

    Egbin 1 and Zungeru 1 emerged as the highest power producers, with average outputs of 717MW and 677MW respectively, while Delta followed with 482MW.

    Smaller power plants such as Afam I-V, Sapele ST, Olorunsogo NIPP, Omotosho NIPP, Sapele GT NIPP, Ihovbor NIPP, Geregu NIPP, Omotosho, Olorunsogo, Ibom Power, Rivers NIPP, Omoku, Trans Amadi, Igbafo, Taopex Energy, Mepp, and Dadin Kowa generated a combined average of 1,295MW, representing 23.3% of the total energy output.

    However, some plants performed below capacity. For instance, Trans Amadi 1 and Rivers 1 produced just 7MW and 9MW on average, while Alaoji 1 and Afam 1 failed to generate any power during the period, despite their installed capacities of 500MW and 726MW.

    NERC’s data also revealed that the average hourly available capacity from the 28 power plants was 4,340MWh/h during the review period, further underscoring the gap between installed capacity and actual performance in Nigeria’s power sector.

    Related News

    Nigeria’s gas output climbs to 7.93bcf/d as domestic demand strengthens — NUPRC

    NUPRC attributes rise in Nigeria’s oil production to ‘sustained positive momentum’

    New crude grades inject 12 million barrels into Nigeria’s oil output

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    Nigeria’s gas output climbs to 7.93bcf/d as domestic demand strengthens — NUPRC

    June 16, 2026

    World Bank lists Tincan, Apapa ports on global top 20 improved ports

    June 16, 2026

    NUPRC attributes rise in Nigeria’s oil production to ‘sustained positive momentum’

    June 16, 2026

    Resurgent piracy and grey-zone pressure reshape maritime risk

    June 16, 2026

    Oil drops about 4% to three-month low as markets weigh US-Iran deal

    June 16, 2026
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2026 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.