Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » AfDB grants Malawi $3.04 million for Kholombidzo power feasibility study

    AfDB grants Malawi $3.04 million for Kholombidzo power feasibility study

    March 26, 2013
    Share
    Facebook Twitter LinkedIn WhatsApp

    29 March 2013, Sweetcrude, African Press Organization (APO), LILONGWE, Malawi — The African Development Bank (AfDB) Group (http://www.afdb.org) approved, on March 25, 2013, a grant amounting to US $3.04 million to finance the Kholombidzo Hydroelectric Power Plant (HPP) Feasibility Studies in Malawi. The Government of Malawi will contribute US $0.23 million (7%) of the total study cost of US $3.27 million.

    The grant aims to produce a full bankable feasibility study for the future development of a power generation project to contribute to the expansion of electricity generating capacity in Malawi, which would ultimately help to address electricity shortages and enable the delivery of reliable energy and electricity access expansion in Malawi.

    The study is consistent with the objectives of the Malawi Growth and Development Strategy II (MGDS II) which emphasizes the importance of putting in place a foundation for long-term economic growth through improved infrastructure and investment climate. By supporting the study, the African Development Fund will be contributing to facilitating investment in the provision of electricity needed for supporting economic growth and poverty reduction. The initiative also presents an opportunity for knowledge sharing from previous experiences in other member countries.

     

     

     

    Related News

    U.S. coal power plants well stocked through 2026, EIA says

    Kaduna DisCo underperforms with alarming 68.57% ATC&C loss in Q1

    Lhyfe raises €2.5m through bonds for the green hydrogen production sector

    E-book
    Resilience Exhibition

    Latest News

    Group launches fossil fuel phase-out campaign, rejects oil resumption in Ogoni

    July 24, 2025

    TotalEnergies starts production from two offshore Angola projects

    July 24, 2025

    Nigeria’s Senate approves President Tinubu’s $21bn external borrowing plan

    July 24, 2025

    Nigeria’s power sector loses N200bn to systemic inefficiencies in Q1 2025

    July 24, 2025

    60 days later, Port Harcourt Refinery inoperable despite $1.5bn revamp

    July 24, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.