Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Azito Phase IV: Azito Energie selects GE technology to add 253 MW Power in Côte d’Ivoire

    Azito Phase IV: Azito Energie selects GE technology to add 253 MW Power in Côte d’Ivoire

    February 6, 2020
    Share
    Facebook Twitter LinkedIn WhatsApp
    *GE’s Total Plant Solutions at Azito Power Plant.

    *Once Phase IV Extension is Complete, the power plant is expected to generate approximately 710 Megawatts (MW), representing 30% of power in Côte d’Ivoire

    ABIDJAN, Ivory Coast — GE has been Selected to Provide Generation Equipment, and 20-Year Services for Azito’s Phase IV Extension Combined-Cycle Power Plant in Côte d’Ivoire; Once Phase IV Extension is Complete, the power plant is expected to generate approximately 710 Megawatts (MW), representing 30% of power in Côte d’Ivoire

    GE (NYSE: GE) announced today that it has been selected by Azito Energie S.A. to provide gas turbine technology and services for Azito phase IV power plant, located in the Yopougon district of Abidjan in Côte d’Ivoire. The extension of the power plant will generate 253 megawatts (MW) and will play a significant role in supporting the country’s energy plan.

    “We have a long-standing relationship with GE and are thrilled that the Azito phase IV power plant, will also be one of the most efficient power plants in the region and will serve as a model for the development of similar power projects in Africa”, said Luc Aye, Managing Director, Azito Energie S.A. “Providing reliable and sustainable power is a priority for us. Our plant makes use of Côte d’Ivoire’s supplies of natural gas and with this expansion we will continue to contribute significantly to country’s energy security and stability”.

    Under this contract, GE will supply its GT13E2 gas turbine in combined-cycle configuration, one heat recovery steam generator, one steam turbine generator, condenser and associated systems and maintenance services for 20 years.

    Also Read: GE’s total plant solutions help Azito’s Power Plant boost efficiency

    GE’s GT13E2 gas turbine offers industry leading efficiency in the E-class segment. It delivers power and performance while offering a flexible extended maintenance concept that reduces operating costs while saving fuel. Upon completion of the Azito phase IV extension, the entire power plant is expected to generate approximately 710MW, representing up to 30% of the nations’ power supply.

    “GE has been committed to the development of Côte d’Ivoire’s power sector and plays a critical role in laying the foundational infrastructure needed to build a modern economy,” said Elisee Sezan, CEO for GE’s Gas Power business in sub–Saharan Africa. “We are honored to continue to support Azito Energie, with our offering of full range of local capabilities, expertise and unique power generation solutions”.

    Since 1999, GE has provided maintenance services at Azito power plant, with the first combined cycle power plant connected to the grid in 2015. Earlier this year, GE announced the successful execution of GE’s MXL2 upgrade solution for the GT13E2 gas turbines at Azito III site (https://bit.ly/2SnIfMj), as part of a contract which will increase the power plant’s production by 30MW, equivalent power for up to 24,000 homes.

    Follow us on twitter

    Related News

    India’s $80 billion coal-power boom is running short of water

    NDPHC launches 7.5MVA substation in Borno to boost power supply

    Shettima inaugurates power project in Borno university

    E-book
    Resilience Exhibition

    Latest News

    Amakpe Refinery Chairman sues financial firm, denies $1.46m debt claim

    June 10, 2025

    Recovered funds boost student loans, credit access for civil servants – EFCC

    June 10, 2025

    Nigeria commits $50m to Wholesale Impact Investment Fund

    June 10, 2025

    OPEC head says oil demand will keep growing

    June 10, 2025

    ‘Shell’s decision on Phase 2 of LNG Canada will depend on other opportunities’

    June 10, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.