Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » NERC release grid code for electricity transmission system

    NERC release grid code for electricity transmission system

    October 2, 2018
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Power transmission-tower

    OpeOluwani Akintayo

    02 October 2018, Sweetcrude, Lagos — The Nigerian Electricity Regulatory Commission, NERC, has released a Grid Code for the Nigerian Electricity Transmission System.

    According to the body, the grid code and guidelines shall be called the Grid Code for the Nigeria Electricity Supply Industry, NESI henceforth referred to as the “Code”.

    The Grid Code contains the day-to-day operating procedures and principles governing the development, maintenance and operation of an effective, well-coordinated and economic Transmission System for the Nigerian Electricity Supply Industry.

    The code is designed to: facilitate an efficient production and supply of electricity for all Users of the Transmission System and TCN itself, without any act of discrimination between Users or class of Users, and facilitate competition in the generation and supply of electricity in the country.

    The Electric Power Sector Reform Act, 2005 referred to as the Act, gave legal backing to the unbundling of the Nigeria Power Sector. The Act stipulates the functional unbundling of the Generation, Transmission and Distribution Sectors.

    According to Sections 8, 65 and 66 of the Act, NERC said TCN henceforth, will be established and licensed to perform the functions of transmission and system operations of the High Voltage network of the Nigerian Electricity Supply Industry.

    In applying the Grid Code, NERC said will apply to TCN and Users of the Transmission System.

    “TCN shall be responsible for implementation of the Grid Code. All Users, the System Operator, and the Transmission Service Provider shall comply with the Grid Code and assist TCN in this regard. Users must provide all the required information and reasonable rights of access, service, and facilities necessary for the implementation of the Grid Code”.

    Related News

    UAE’s power capacity to reach 79.1GW in 2035

    Nigeria’s renewable power capacity to reach 1.7GW in 2035

    Nigeria seeks alternative funding for N2trn power sector debt

    E-book
    Resilience Exhibition

    Latest News

    Crude climbs on US jobs report, China talks

    June 6, 2025

    Be deliberate in securing govt facilities in your communities – IBAS

    June 6, 2025

    UAE’s power capacity to reach 79.1GW in 2035

    June 6, 2025

    Gold steady near week high as markets brace for key US jobs data

    June 6, 2025

    Nigeria’s renewable power capacity to reach 1.7GW in 2035

    June 6, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.