Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Community Development
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Portugal wants EU to pressure reluctant France on power connections

    Portugal wants EU to pressure reluctant France on power connections

    May 28, 2025
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Power transmission line

    Cascais, Portugal,– The EU must enforce common market rules to integrate the Iberian peninsula’s power grid into wider Europe, overcoming France’s reluctance to add interconnections, Portugal said on Tuesday, after a massive blackout hit the peninsula last month.

    The blackout, which started in Spain and also left mainland Portugal without electricity on April 28, could have been less crippling had the two countries had more interconnections to resume power supplies rather than just relying on their own power plants, according to experts and officials.
    Last Wednesday, the energy ministers of Spain and Portugal sent a letter to the EU energy commissioner Dan Jorgensen asking him to step in.
    “France has a lot of nuclear energy and does not have a great interest in importing cheaper renewable energy from Iberia,” Portuguese Energy Minister Maria da Graca Carvalho told reporters on the sidelines of an event in Cascais, near Lisbon.
    But the European Commission can “pressure” France to comply with the rules of the EU electricity market, she added.
    “If we (Portugal) do something that is considered a barrier to the internal market, the Commission wastes no time in sending us a letter with a warning. So we expect the same attitude towards France,” Carvalho said.
    Iberia lags behind the EU’s target for all countries to have 15% of their energy system interconnected to the broader European network by 2030, with its share stuck at just 3%.
    Works to strengthen an existing interconnector between France and Spain are expected to wrap up this year, while a new underwater power line spanning the Bay of Biscay is set to be completed by 2028.
    Although French grid operator RTE has studied the feasibility of building two additional interconnections with Spain over the Pyrenees, Carvalho said they are not part of France’s new plan until 2035, which she said “worries” her.

    Reporting by Sergio Goncalves Editing by Gareth Jones – Reuters

    Related News

    ‘Developers to add 18.7 GW of natural gas-fired capacity by 2028’

    Anzana Electric and AfDB power up Burundi’s energy future

    India’s $80 billion coal-power boom is running short of water

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    NSC seeks closer collaboration with Police to boost Port enforcement

    June 12, 2025

    Senate Committee commends NCDMB, pledges support to drive the local content development

    June 12, 2025

    Tinubu pardons Ken Saro-Wiwa, confers national honours on Ogoni Nine

    June 12, 2025

    Ensure NDDC 2025 budget reflects economic realities – Stakeholders

    June 12, 2025

    Nigeria reaffirms partnership with ILO on promoting social justice & decent work

    June 12, 2025
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2025 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.