Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Environment
    • Community Development
    • Renewable Energy
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » TotalEnergies starts production from two offshore Angola projects

    TotalEnergies starts production from two offshore Angola projects

    July 24, 2025
    Share
    Facebook Twitter LinkedIn WhatsApp
    *TotalEnergies’ CLOV FPSO. Image credit – Igor Sachs.

    Lagos — TotalEnergies has announced the start of production from the BEGONIA and CLOV Phase 3 offshore Angola projects, which together will add a total of 60,000 bpd of new production. The two subsea tie-back projects will deliver additional production leveraging available capacity on existing FPSOs, TotalEnergies stated, citing added benefits of low marginal costs and low carbon intensities.

    TotalEnergies has begun production from its BEGONIA development, located in Block 17/06. BEGONIA is the first inter-block development in Angola, TotalEnergies said. Located 150 km off the Angolan coast, BEGONIA is a 30,000 bpd project consisting of five wells subsea tied back to the PAZFLOR FPSO.

    TotalEnergies also announced the first oil from CLOV Phase 3 in Block 17, in agreement with ANPG and its partners Equinor (22,16%), ExxonMobil (19%), Azule Energy (15.84%) and Sonangol E&P (5%). Located 140 km from the Angolan coast, CLOV Phase 3 is a 30,000 bpd project consisting of four wells subsea tie-back to the CLOV FPSO.

    “TotalEnergies, operator of Block 17 and 17/06, continues to actively deliver its low-cost and low-emissions developments to grow its upstream production by more than 3% in 2025,” stated Nicolas Terraz, E&P President at TotalEnergies. “With BEGONIA and CLOV Phase 3, we are leveraging available production capacity in existing FPSOs of Block 17 (PAZFLOR and CLOV) while reducing costs and emissions.”

    “These two first oils will help Angola maintain its production levels above 1 million bpd,” added Paulino Jerónimo, Chairman of the Board of Directors of ANPG. “BEGONIA is the first project between Blocks in Angola with a significant component of Local Content and CLOV 3 is a great achievement resulting from intense work between the concessionaire and the B17 contractor group, operated by TotalEnergies.”

    Related News

    Oil falls 5% to three-month low as US, Iran reach peace deal to reopen Strait of Hormuz

    Pipeline vandalism surges as NNPC records fresh attacks in North Central

    Nigeria targets oil revenue gains as IMF backs reforms

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    AFC backs $7bn Dangote Fertiliser expansion

    June 15, 2026

    Oil falls 5% to three-month low as US, Iran reach peace deal to reopen Strait of Hormuz

    June 15, 2026

    Pipeline vandalism surges as NNPC records fresh attacks in North Central

    June 15, 2026

    Nigeria’s company tax revenue drops 31% despite mining strength

    June 15, 2026

    Ibom FZE supports host community pupils, education

    June 15, 2026
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2026 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.