Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    SweetCrudeReportsSweetCrudeReports
    Subscribe
    • Home
    • Oil
    • Gas
    • Power
    • Solid Minerals
    • Labour
    • Financing
    • Freight
    • Environment
    • Community Development
    • Renewable Energy
    • E-Editions
    SweetCrudeReportsSweetCrudeReports
    Home » Akobo Minerals commissions Segele gold processing plant

    Akobo Minerals commissions Segele gold processing plant

    July 23, 2024
    Share
    Facebook Twitter LinkedIn WhatsApp
    *Akobo Minerals commissions Segele gold processing plant.

    Oslo, Norway — Akobo Minerals, a leading gold exploration and mining company based in Scandinavia with operations in Ethiopia, is pleased to announce that the Segele processing plant is now operational. This milestone represents a significant advancement for the company’s operations in Ethiopia.

    The commissioning process has successfully activated the majority of the Segele plant, allowing Akobo Minerals to process a substantial amount of ore efficiently and safely. Last week, the first phase of commissioning was completed, with Gekko Systems and Solo Resources overseeing the setup of the milling, grinding, Falcon concentrator, InLine Leach Reactor, and furnace in the gold room. The final phase, the activation of the InLine Leach Reactor (ILR), was completed by Gekko Systems. The company anticipates an extraction efficiency of 76% from the concentrator and ILR system.

    Jørgen Evjen, CEO of Akobo Minerals, remarked, “This is a great achievement for our team and a testament to the quality and build of the processing plant. We have received solid feedback and are proud of the strong work from our team. We look forward to processing our first ore and moving forward with the project.”

    Akobo Minerals appreciates the strong support and interest from the Ethiopian Government in the Segele project. The company recently hosted a delegation, including Deputy Prime Minister Temesgen Tiruneh, Minister of Mines Habtamu Tegegne, and Gambella President Omod Ojulu, who were on-site to oversee the first run of operations.

    In line with a phased approach to optimize both operational efficiency and cost-effectiveness, the commissioning of the CIL (Carbon in Leach) system will be deferred until production volumes are increased. This strategy ensures that the plant operates in a cost-effective manner while allowing the team time to familiarize themselves with the initial phase of the plant. Tailing from the current ore will be stored and reprocessed once the CIL tanks are operational.

    The plant is designed with the capability to produce 4,000 ounces of gold per month, with an expected recovery rate of 96%. Additionally, its modular design allows for future upgrades as the Segele mine and adjacent targets are developed, ensuring the plant remains adaptable to evolving operational needs.

    Currently, the company is blasting and mining ore from the Western winze and expects to process low-grade ore through the plant in the coming weeks.

    Related News

    Mining boom risks environmental crisis without stronger oversight

    Lithium, gold fuel $3bn mining investment surge in Nigeria

    The unforgiving calculus: Nigeria’s mining industry in Q3 2026

    Comments are closed.

    E-book
    Resilience Exhibition

    Latest News

    ‘Grid fragility to worsen in Q3 as gas producers bypass DisCos’

    June 23, 2026

    Mining stakeholders seek clarity on implementation of sector laws

    June 23, 2026

    Sub-$80 oil tests Nigeria’s deregulation resolve

    June 23, 2026

    Mining boom risks environmental crisis without stronger oversight

    June 23, 2026

    Lithium, gold fuel $3bn mining investment surge in Nigeria

    June 23, 2026
    Demo
    Facebook X (Twitter) Instagram
    • Opec Daily Basket
    • Oil
    • Power
    • Gas
    • Freight
    • Financing
    • Labour
    • Technology
    • Solid Mineral
    • Conferences/Seminars
    • Community Development
    • Nigerian Content Initiative
    • Niger-Delta Question
    • Insurance
    • Other News
    • Focus
    • Feedback
    • Hanging Out With Markson

    Subscribe for Updates

    Get the latest energy news from Sweetcrudereports.

    Please wait...
    Please enter all required fields Click to hide
    Correct invalid entries Click to hide
    © 2026 Sweetcrudereports.
    • About Us
    • Advertise with us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.